We installed an air driven leachate pump to pump materials from different cells within the site continually sampling the leachate quality. When the tanker was loaded a suitable treatment route was sourced and the contaminated material was tankered off site.
Our staff were based on site 24 hours a day, 7 days a week for 6 weeks.
Our customer ended up with all the information he required to make a long term decision regarding the site. |